Potable Waterline System

U.S. ARMY CORPS OF ENGINEERS, TULSA DISTRICT
LOCATION: Toronto Lake, Toronto, Kansas

CONTRACT:
W912BV20P0137
PRIME CONTRACTOR
50% Self-Performed
Zero Incidents or Accidents

AWARDED AMOUNT: $35,751.08
AWARD DATE: 16 SEP 2019
START DATE: 18 NOV 2019
COMPLETION DATE: 28 NOV 2019

DESCRIPTION:
Install approximately 1750 linear feet of 2” HDPE potable waterline by trenching to 36” depth and attaching it to the meter for the Rural Water District supply line. Fusion Weld the pipe and fittings according to industry standards. Disinfect the line for potable water service. The pipe was terminated with a Hydrant next to the Dam Office.

 
 

Pipe placed on ground and welded.

Trenching completed with proper safety controls.

 
 
Machinery on site.

Machinery on site.

The meter installation.

 